Aupark Bratislava — data nodes
Aupark Bratislava · Bratislava, Slovensko
Water put out a cable fire. It flooded the shops one floor below and took the CCTV system down for three months.
Read the case studyŠkoda Auto, Hyundai, CRH, Synthesia, OLO, Mondi. Most of them came to us after a fire had already cost them something. Below is what each site needed and how it turned out.
Aupark Bratislava · Bratislava, Slovensko
Water put out a cable fire. It flooded the shops one floor below and took the CCTV system down for three months.
Read the case study
Škoda Auto · Mladá Boleslav, Česká republika
After a bad experience with gas suppression in the engine shop, they needed something that harms neither electronics nor people.
Read the case study
Hyundai Motors SR + ČR · Slovensko a Česká republika
After a robotic line fire ran into millions, the Korean head office sent representatives to Slovakia.
Read the case study
DEZA a.s. · Česká republika
The standards called for 12 kg of powder. The head of the works brigade bet that 4 kg would not do it. It did.
Read the case study
CRH Slovensko a.s. (ex Holcim) · Slovensko
Chemical processes cause self-ignition. Water and foam are no use in lime and adhesive production — and in frost they freeze.
Read the case study
Synthesia a.s. · Pardubice, Česká republika
Chemical production, explosives manufacture, cable ducts and munitions stores. Working together since 2016.
Read the case study
Nidec Global Appliance Slovakia s.r.o. · Slovensko
Gas suppression failed to put the furnace out and burned with it. The plant director puts the saving from the new system above a million euros.
Read the case study
JAS Plastik · Galanta, Slovensko
Twenty silos releasing explosive pentane. The space must stay ventilated and the suppression must not wait.
Read the case study
MONDI Štětí a.s. · Štětí, Česká republika
In Ružomberok a conveyor tower burned down while the dry riser was still being coupled to a tanker.
Read the case study
Mondi · Česká republika
The lower part of the tower rotates about its own axis, so wiring the top to the bottom was impossible.
Read the case study
OLO a.s. · Bratislava, Slovensko
The incinerator turbogenerator is also a power station for Bratislava. Shutting it down is more than a fire incident.
Read the case study
Hubert Schmid Recycling und Umweltschutz GmbH · Nemecko
The first fire took the brigade several days and cost millions. The second, in the same buildings, ended with no property damage.
Read the case study
TSS GRADE a.s. · Česká republika
Two MPH-5T and two MPH-5T-2 modules on the engine alone. Installed 16 October 2024.
Read the case study
TSS GRADE / Hrochostroj · Česká republika
The previous fire cost roughly 3.5 million euros and two years of rebuilding.
Read the case study
Nemocnica akademika Ladislava Dérera · Bratislava, Slovensko
A new day-care unit and a new electrical design including data networks across the whole hospital.
Read the case study
Evanjelický kostol Bratislava · Bratislava, Slovensko
Complete rewiring, data networks capable of live TV broadcast, and intelligent LED lighting.
Read the case studyWe walk the site, split it into suppression zones and specify the modules. No mains power, no pressure, a 12-year service life.