Water put out a cable fire. It flooded the shops one floor below and took the CCTV system down for three months.
Read the case studyA new day-care unit and a new electrical design including data networks across the whole hospital.
Construction of a new day-care unit and refurbishment of the surrounding spaces. The work included a new electrical design covering data networks across the whole hospital, new wiring throughout and the electrical refurbishment of consulting rooms. A hospital cannot be shut down, so the works had to fit around live operation and be phased accordingly.
Water put out a cable fire. It flooded the shops one floor below and took the CCTV system down for three months.
Read the case study
After a bad experience with gas suppression in the engine shop, they needed something that harms neither electronics nor people.
Read the case study
After a robotic line fire ran into millions, the Korean head office sent representatives to Slovakia.
Read the case study