SCHWEERBAU SPML 16-2 grinder — hydraulic heads

The previous fire cost roughly 3.5 million euros and two years of rebuilding.

Suppression for the hydraulic grinding heads and hoses on a rail grinder, delivered with TSS GRADE and Hrochostroj. The motivation was the earlier loss: roughly 3.5 million euros and two years before the machine ran again. Pressurised hydraulics combined with grinding sparks is about the worst brief there is — and precisely why suppression must fire within seconds, not when a brigade arrives.

More case studies

All sectors
Aupark Bratislava — data nodes
Power and utilities · 2016

Aupark Bratislava — data nodes

Water put out a cable fire. It flooded the shops one floor below and took the CCTV system down for three months.

Read the case study
Škoda Auto — Mladá Boleslav
Industry · 2017

Škoda Auto — Mladá Boleslav

After a bad experience with gas suppression in the engine shop, they needed something that harms neither electronics nor people.

Read the case study
Hyundai Motors — robotic lines in SK and CZ
Industry · 2018

Hyundai Motors — robotic lines in SK and CZ

After a robotic line fire ran into millions, the Korean head office sent representatives to Slovakia.

Read the case study