Aupark Bratislava — data nodes
Water put out a cable fire. It flooded the shops one floor below and took the CCTV system down for three months.
Read the case studyThe lower part of the tower rotates about its own axis, so wiring the top to the bottom was impossible.
A tall conveyor tower exposed to frost, wind, rain and summer heat around the clock. Add one structural detail that decided the whole solution: the lower part of the tower rotates about its own axis, so top and bottom could not be linked by cable. Autonomous zones with no electrical link between them are the only way. Because of the environment, we run a service check every six months.
Water put out a cable fire. It flooded the shops one floor below and took the CCTV system down for three months.
Read the case study
After a bad experience with gas suppression in the engine shop, they needed something that harms neither electronics nor people.
Read the case study
After a robotic line fire ran into millions, the Korean head office sent representatives to Slovakia.
Read the case study