Services

From splitting a site into zones to the inspection in year twelve

An MPH system is not a box off the shelf. First we need to know what burns in your space and where it starts. The building is then split into suppression zones, and each one gets its own TPS sensor and one or more modules. That groundwork is our job, not yours.

What we do for you

Our services

Fire risk audit of your facility

Fire risk audit of your facility

We walk the site and tell you where a fire will start and what goes down with it first.

  • Site walk-through and identification of risk zones
  • Fire classes A, B, C and E based on the actual materials
  • Division into separate suppression zones
Price on request Details
System design and project documentation

System design and project documentation

Zone by zone. Where the sensor goes, how many modules hang off it, and what happens after the discharge.

  • Division of the facility into suppression zones
  • Sensor activation temperature chosen to suit the location
  • Connection to alarms, GSM modules and SA-01 signalling
Price on request Details
Installation by an authorised technician

Installation by an authorised technician

We swap a suppression lamp in 30 minutes. A three-room flat is done in 3 to 5 hours.

  • Authorised SAPFIR technician
  • Suppression lamp: ~30 min per luminaire
  • Three-room flat: 3–6 systems, 3–5 hours
Price on request Details
Inspections and servicing

Inspections and servicing

The system is maintenance-free; an inspection is not maintenance. Once a year at home, every 6 months in industry.

  • Suppression lamps: inspected once a year
  • Industry: service check every 6 months
  • Checks on sensors, anchoring and the alarm circuit
Price on request Details
Operator training

Operator training

The system works without people. People still need to know what to do before and after.

  • How and when the system fires
  • Using the TPS-01M manual actuator
  • Handling the MPH-5M grenade
Price on request Details
Supply of fire suppression equipment

Supply of fire suppression equipment

MPH modules, TPS sensors, suppression lamps, Raptor and Ranger mobile systems.

  • The full MPH 0.65 – 24 module range
  • TPS sensors including transport and high-temperature versions
  • Suppression lamps, Raptor, Ranger, MPH-5M, SA-01
Price on request Details
How it runs

Three steps from survey to handover

  1. 1

    Site survey and zoning

    We walk the space and work out where a fire actually starts — a switchboard, a motor, a granulate silo. Every zone gets its own sensor and modules.

  2. 2

    Installation by an authorised technician

    One luminaire takes roughly 30 minutes. A three-room flat with three to six systems is done in three to five hours.

  3. 3

    Inspections across twelve years

    The system is maintenance-free, but the guaranteed 12-year service life holds only with regular annual inspections. In industry we service every six months.

Installing a suppression system

Not sure which service is yours?

Give us a ring. A few minutes on the phone usually settles whether one module in a switchboard will do, or whether a site survey is worth it.