Aupark Bratislava — data nodes
Water put out a cable fire. It flooded the shops one floor below and took the CCTV system down for three months.
Read the case studyComplete rewiring, data networks capable of live TV broadcast, and intelligent LED lighting.
Building works and a complete rewiring in October 2021. We added data networks capable of live television broadcast and new intelligent LED lighting with remote control. Handed over with quality certificates and inspection reports. In 2023 we carried out a comparable rewiring at the Church of St Mary Magdalene — after the plaster was stripped back, with the speaker cabling repaired, in seven days.
Water put out a cable fire. It flooded the shops one floor below and took the CCTV system down for three months.
Read the case study
After a bad experience with gas suppression in the engine shop, they needed something that harms neither electronics nor people.
Read the case study
After a robotic line fire ran into millions, the Korean head office sent representatives to Slovakia.