OLO Bratislava — from collection yards to the incinerator
OLO a.s. · Bratislava, Slovensko
The incinerator turbogenerator is also a power station for Bratislava. Shutting it down is more than a fire incident.
Read the case studyŠkoda Auto, Hyundai, CRH, Synthesia, OLO, Mondi. Most of them came to us after a fire had already cost them something. Below is what each site needed and how it turned out.
OLO a.s. · Bratislava, Slovensko
The incinerator turbogenerator is also a power station for Bratislava. Shutting it down is more than a fire incident.
Read the case study
Hubert Schmid Recycling und Umweltschutz GmbH · Nemecko
The first fire took the brigade several days and cost millions. The second, in the same buildings, ended with no property damage.
Read the case study
Nemocnica akademika Ladislava Dérera · Bratislava, Slovensko
A new day-care unit and a new electrical design including data networks across the whole hospital.
Read the case studyWe walk the site, split it into suppression zones and specify the modules. No mains power, no pressure, a 12-year service life.